主页
快速公交
公交线路
Updated: 18-Jan-10
哈尔滨BRT概念性规划
Current Situation and Issues
Mass Transit Options
2.1 Status & Proposals
2.2 Construction Time
2.3 Design, Construction & Operating Costs
2.4 Citywide Coverage
2.5 Benefits
2.5.1 Time Savings
2.5.2 Operational Savings
2.5.3 Other Benefits
BRT Network Plan
3.1 Corridor Selection
3.2
BRT一期走廊
3.3 BRT二期走廊
3.4 Long Term BRT Network
Operational Plan
4.1 Demand Analysis
4.2
BRT线路
4.3 BRT Operation
Difficult Points
BRT车站
6.1 Station Location
6.2 Station Size
6.3 Station Configuration
6.4 Station Architecture
6.5 Standard Section Designs
BRT Vehicles
Fare Collection & ITS
Pedestrian & Bicycle Integration
Public Space & Urban Design
Institutions and Regulation
Financing
Marketing & Outreach
Construction & Implementation Schedule